Preparing Your Lot for Construction to Begin

Complete site preparation and development services in Yonkers for new construction and building pad installation.

Before any foundation is poured or framing begins in Yonkers, the site must be cleared, leveled, and prepared to support the structure. A.M.C. Excavation, LLC handles lot clearing, base excavation, and elevation work so builders can start with a stable, accessible pad that matches the engineered plans. Whether you are building a new home or preparing a commercial lot in Yonkers, site prep removes vegetation, grades the pad, and sets the stage for utilities and foundation installation.

Site preparation includes tree and brush removal, topsoil stripping, and rough grading to establish the building pad elevation. Base material is spread and compacted to prevent settling under slabs or footings. Layout stakes are placed to mark foundation corners, setbacks, and utility corridors. Drainage is sloped away from the building area to keep water from pooling during construction.

A.M.C. Excavation, LLC coordinates with contractors and engineers in Yonkers to deliver a ready-to-build site on schedule.

How a Lot Becomes Ready for Building

Site development in Yonkers begins with clearing vegetation and removing stumps, roots, and debris that would interfere with grading or foundation work. Topsoil is stripped and stockpiled for later use in landscaping. The pad is then excavated or filled to the elevation shown on the grading plan, with slopes built to direct surface water away from the structure.

Once rough grading is complete, you will see a level building pad with clear access for concrete trucks, material deliveries, and utility crews. Base material is compacted in lifts to provide a stable surface that will not shift under load. Erosion control measures such as silt fencing or straw bales are installed if the site will remain open for an extended period.

Accurate elevation work ensures that finished floor heights, driveway connections, and utility tie-ins align with municipal requirements. Coordination with utility companies and inspectors happens before backfill or paving begins. This service does not include foundation installation, utility line installation, or asphalt paving. It delivers a graded, compacted site ready for the next phase of construction.

Site Work Raises Practical Questions

Property owners and contractors often ask similar questions about timing, grading, and site access before work begins. These answers address the most common concerns.

What is included in complete site preparation?
Site prep includes clearing, grubbing, topsoil removal, rough and finish grading, base compaction, and layout staking. It also includes erosion control and drainage grading to protect the site during construction.
How long does site prep take for a residential lot?
Most single-family lots in Yonkers are cleared and graded in three to five days depending on tree density, soil conditions, and elevation changes. Larger lots or sites with rock may take longer.
Why is base compaction necessary before building?
Compacted base material prevents settling under foundations, slabs, and driveways. Without proper compaction, structures can crack or shift as the soil consolidates over time.
What happens to topsoil during site prep?
Topsoil is stripped and stockpiled on-site for later use in final grading and landscaping. If there is excess or if the soil is unsuitable, it is hauled off and replaced with engineered fill material.
When should site prep be scheduled?
Site prep should begin after permits are issued and before foundation contractors arrive. Scheduling early ensures the pad is ready when concrete forms are delivered and utility trenches are dug.

A.M.C. Excavation, LLC works with builders, engineers, and property owners in Yonkers to prepare sites that meet code, match plans, and stay on schedule. Contact us to review your grading plan, confirm access, and set a start date for clearing and pad preparation.